Charging station installation process
The right device and installation scope are set by each site’s electrical infrastructure and usage needs. Here you can see what to share for a first request and how the process moves forward.
Describe your projectAssessment in four steps
Details of each step change with the site and the selected product.
- 01
Share your needs
Tell us what you know about the site type, expected users, desired AC or DC charging points and existing infrastructure.
- 02
Assess technical fit
Let’s identify suitable options from available electrical capacity, vehicle dwell time, socket count and device placement.
- 03
Clarify scope and quote
Device selection, any infrastructure work, installation scope and schedule are clarified for the project conditions.
- 04
Installation and commissioning
Mounting, connection and commissioning steps for the agreed solution follow the project plan.
Which information helps?
You do not need every technical value. What you already know is enough to start a first assessment.
Location
City, district, facility type and planned device position.
Usage
Daily vehicle count, dwell time and single- or dual-socket expectation.
Electrical infrastructure
Current connection and power details; if unknown, we assess them in the first meeting.
Site information
Photos, layout plans and access conditions if available.
How are price and timeline set?
Installation cost and schedule are set after device model, existing electrical infrastructure, cable route, mounting location and any extra site work are assessed. That is why we do not publish fixed package prices or completion times here.