Site Assessment
Assessment of the location and mounting area
Field Installations
We are with you for planning, installing and commissioning your EV charging infrastructure. Let’s bring the right solution for your site to life together.
Contact Us for InstallationWe define the right solution for your site together.
We plan the electrical infrastructure and device mounting.
We prepare the system for use with checks.
Technical support suited to the product and project scope.
Step by Step
From need to commissioning, we plan every stage of your project together.
We assess the location, usage need and available electrical capacity.
We identify cable, panel and connection needs and plan site work.
We install devices according to the electrical project and site conditions.
We run connection and device checks and commission the charging system.
We brief the operations team on use and support.
Comprehensive Service
The right installation starts with the right plan. We assess device choice, electrical infrastructure and site needs together, and clarify the work to be done in the quote.
Let’s Evaluate Your Project TogetherAssessment of the location and mounting area
Check of available capacity and connection needs
Electrical and mounting work within project scope
Vehicle access, cable route and protection needs
Checks of the device, connection and charging process
Guidance on use and the technical support process

Antalya · Manavgat

Samsun · Gel Dol

EGESA · Bülent Börekçilik

Avrupaşarj

Multi-unit installation

Beytürk Enerji / Fix

Field installation

Cevahir Mall
Real Projects, Real Sites
Browse devices installed from business car parks to commercial sites. At every project we address usage need, vehicle access and available electrical capacity together.
Our Field Experience
Frequently Asked Questions
We are here for questions about the installation process.
See All QuestionsInstallation duration depends on whether the site is ready. Where electrical infrastructure and the mounting area are ready, the process can finish sooner; if cabling, panel, infrastructure or extra site work is needed, it takes longer. The final schedule is set after the site assessment.
An on-site survey is not mandatory for every project. If there is enough information about the location, device count, mounting area and existing electrical infrastructure, a pre-assessment can be done remotely. When infrastructure is unclear or extra electrical and site work is needed, an on-site survey is planned.
Existing facility capacity is checked; cables, panels, connection points and required electrical protections are planned accordingly. If capacity is insufficient, capacity upgrades or load management can be evaluated.
Installation projects in different regions of Turkey are evaluated. The installable location, project scope, site conditions and schedule are clarified at the request stage.
Yes, after-sales technical support is provided. Remote support, field intervention, maintenance and service scope follow the selected product, project and contract terms.
The Right Solution for Your Project
Share your site and needs, and let’s plan the right charging infrastructure together.